Customization: | Available |
---|---|
After-sales Service: | Warranty |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XHHV 535-2L high voltage surge generator (output voltage 0-35kV, built in capacitor -2 microfarad, automaticly discharge,portable)
This device integrates DC high voltage source, energy storage capacitor, discharge ball device, automatic discharge device, and a cart-type high-end experimental instrument. The equipment completely solves the problems of convenience, portability, safety and reliability of traditional experimental devices.
This instrument uses high-precision, high-stability special high-voltage electronic components and high-frequency high-voltage technology, making the whole machine simple in structure. In order to retain people's original habit of using transformers and operating boxes to generate DC high voltage, this pulse generator adopts a humanized design operation mode and integrates a micro-reliable circuit design. It is safe, reliable and intuitive. Really achieve the effect of not being damaged by impact, and it also has the functions of automatic timing impact, manual impact and pressure resistance. It is currently the most user-friendly cart-type DC impact high-voltage equipment in China.
Impact high voltage | 0~35kV |
High voltage partial pressure | 2.5 level |
Built-in capacitor | 2μF |
Discharge power | 0-1225J |
Output voltage polarity | negative polarity |
Impact power | 400W |
Over temperature protection | 85ºC |
Volume(mm) | 520L×300W×390H |
Weight | not more than 29kg |
Power supply | AC220V±10%, 50Hz±2Hz(60Hz can be customized) |
Ambient temperature | -20~+50ºC |
1. Safety ground: The ground of the instrument shell must be reliably connected to the ground in order to prevent the instrument shell from being electrified or electric shock to personnel.
2. High-voltage ground: Also known as high-voltage tail, it must be grounded reliably to prevent high-voltage leakage and discharge. Poor contact may cause failure to boost the voltage, high voltage breakdown of the internal components of the instrument, and safety accidents caused by leakage or discharge inside the instrument.
3. Sampling ground: The negative terminal of the pulse energy storage capacitor has a high voltage and must be grounded reliably. It is used for sampling when the waveform is sampled under the high-voltage flashover state of the cable fault tester. (Without high-voltage flashover sampling, reliable grounding is still required).
4. Discharge button: Press this button to make contact with the ball gap, and discharge manually. (The duration of each key press cannot exceed 1s).
5. High voltage start button: When the start button light is on, it means that the voltage output is in the zero position. When the light is on, the start button is valid. If the start button light is not on after turning on the power switch, turn the voltage adjustment knob counterclockwise until the light is on. When the button light is on, press this button to start the device and generate high voltage output.
6. High-voltage stop button: When the test is completed or an abnormality occurs, press this button to cut off the high-voltage output, the high-voltage light goes out, and the internal discharge ball stops working. When the stop key is on, it means there is high voltage output, and when it is off, it means there is no high voltage output.
7. Over-current protection switch: When pressed, it means that the over-current protection function has started; when it is popped up, it means that the instrument has triggered the over-current protection.
15. High-voltage output (EMP): When impacting discharge, connect the high-voltage output line.
16. High voltage output (DC): When DC withstand voltage, connect the high voltage output line.
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Application-underground cable fault location
Packaging: Wooden case filled with foam
Shipping: by Air, Sea, Express, etc.
Shipping time: 7-15 days if it's in stock.
Q: Are you trading company or manufacturer ?
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,
it is according to quantity.
A: Payment<=1000USD, 100% in advance.