• Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
  • Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
  • Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
  • Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
  • Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
  • Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

After-sales Service: Warranty Certificate
Warranty: 12 Months
Usage: Digital Cable Tester
Power: Electricity
Certification: CE, ISO
Customized: Customized
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
XHHG521A
Color
Black
Transport Package
Exported Wooden Case
Trademark
XZH TEST
Origin
China
Production Capacity
2000PCS/Year

Product Description

Introduction
The cable outer sheath fault tester XHHG521A is designed based on the MURRAY bridge principle and can be used to locate the breakdown points of various wires and cables and the defect points that have no breakdown but low insulation resistance values.

The equipment uses an electric voltage regulator and an R-type transformer to form a high-voltage constant current source, and the button operation can increase or decrease the voltage. The no-load voltage is 7500V, the short-circuit current is 100mA, and a high-sensitivity amplifier and galvanometer are used to indicate balance. It forms a balanced bridge with a proportional potentiometer, and the whole is placed at a high potential. The measurement cable is a specially designed two-core high-voltage rubber cable. The four-terminal resistance measurement method is used to avoid errors caused by lead resistance. The entire panel is at low potential. One-touch operation, enter the cable length and automatically calculate the fault distance. The high voltage source and bridge are integrated in a portable protective box. Therefore, the device has high voltage, light weight, easy operation and safe use.

Features
ØØOutput voltage is adjustable;
ØHas high accuracy and stability;
ØAdopt high-sensitivity amplifier and galvanometer to indicate balance;
ØZero protection;
ØAutomatically test fault points, but retain manual testing functions;
ØCompared with the wave reflection method, the bridge balance method has no blind area and is used to determine the breakdown point of short cables and near the ends.


High voltage bridges are particularly suitable for
1. The high-resistance breakdown point of the cable after laying, especially the linear high-resistance breakdown point that is difficult to burn into low resistance, such as the linear high-resistance breakdown of the cable intermediate joint.
2. Flashover type breakdown point. After breakdown, the constant current source can maintain the arc, a stable current flows through the bridge, and the bridge has sufficient sensitivity.
3. Defects that have not yet broken down but have low resistance, such as insulation defects found with a megohmmeter that have low cable resistance but do not break down under the operating voltage.

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

 

English version available

Welcome you contact us for more information.

Product Parameters

No load voltage ≥7500V
Short circuit current ≥100mA (when adjusting balance, it is recommended to set it at 5~40mA);
Positioning accuracy ±(0.2%·L±1)m
Weight 25kg
Power supply  AC 220V (±10%), 50Hz±1Hz; 8.4V built-in battery.

Detailed Photos

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

 


--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Introduction of panel

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
 

1. Galvanometer: electrical balance zero point is adjustable;
2. Ammeter: output current indication mA meter;
3. Voltmeter: high voltage output voltage indication kV meter;
4. High-voltage indicator light: This light lights up when there is high-voltage output;
5. Display: displays the operation content;
6. Zero indicator light: When this light is on, it indicates that the voltage output is in zero state;
7. Power socket: instrument working power supply, AC 220V connection port;
8. Fuse holder: The installation place of the fuse of AC 220V power supply system;
9. Power switch: "I" turns on the AC 220V power supply switch, "0" turns off the system power;
10. Start button: When the zero light is on, it means that the voltage output is in the zero state. When it is on, the start button is effective. If the zero light does not light up after turning on the power switch, press the step-down button until the light is on. When the zero light is on, , press this button to start high voltage and generate high voltage output;
11. Stop button: When the test is completed or an abnormality occurs, press this button to cut off the high-voltage output;
12. Boost button: Press this button to increase the output high voltage from small to large;
13. Pressure reduction button: Press this button to reduce the output high voltage from high to low;
14. Selection: "Select" encoder switch operation convention: rotation---cursor movement or number modification operation;
Press---Perform or confirm the operation.
15. Sensitivity adjustment:  Built-in battery-powered switch;  Adjust the sensitivity and use it with the zero adjustment knob;
16. Zero adjustment knob: Rotate the zero adjustment knob to make the galvanometer point to zero;
17. Balance adjustment: Adjust the balance knob until the galvanometer deflects significantly so that the galvanometer points to zero. (If the pointer is to the left, rotate clockwise; if the pointer is to the right, rotate counterclockwise). Observe and record its reading P1;
18. Indicator light: Built-in battery working indicator light, this light will turn on after the sensitivity adjustment is turned on;
19. Reference item: The black clip of the output line is connected to the reference phase;
20. Faulty phase: The red clip of the output line is connected to the faulty phase;
21. Charging: DC8.4V charging port, connect the 8.4V charger to start charging;
22. Grounding post: instrument grounding point, safety protection.

For specific operation methods, please contact us to provide you with more information and services.

------------------------------------------------------------------------------------------------------------------------------------------
Working principle
The principle of the cable fault location bridge method is as follows: short-circuit the fault phase and the non-fault phase of the cable under test, connect the two arms of the bridge to the fault phase and the non-fault phase respectively, and adjust an adjustable resistor on the two arms of the bridge to make the cable Bridge balancing, using proportional relationships and known cable lengths, allows the distance to fault to be determined. The advantage of the cable fault location bridge method is that it is relatively simple, and its accuracy meets the requirements of on-site engineering testing. It is very convenient to measure two-phase short-circuit faults in cable lines. Using the Murray bridge to locate the breakdown point is a classic method, which is convenient and accurate. The bridge method is based on the fact that the resistance of the wire core (or shielding layer) is uniform and proportional to the length. The following figure shows typical usage:
Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

HV is a high voltage constant current source.
Faulty cable CD and auxiliary cable AB have the same core cross-section and length L, and the distance between the fault point and the measuring end is X.
The measurement clamp is connected to both ends of the cable core A and C. The two sides of the clamp are the current and potential ends, which should be reliably connected to the cable.
R is the balance potentiometer, and its reading is percentage.
G is a galvanometer, the electrical balance zero point is adjustable.
At the remote end, both ends of BD must be short-circuited and the short-circuit must be ensured securely.


Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator


------------------------------------------------------------------------------------------------------------------------------------------
Packing list
 

Host(main unit) 1set
 
High power connection wires
 
1set
 
Power cable
 
1pcs
 
Output cable(red, black)
 
1set
 
Ground wire
 
1pcs
 
Charger
 
1pcs
 
Fuse(3A)
 
5pcs
 




-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Application


 

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator




If you need a cable sheath fault pinpoint locator, please contact us.

 





Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator


 

Packaging: Wooden case filled with foam 

Shipping: by Air, Sea, Express, etc.

Shipping time: 7-15 days if it's in stock. 


Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator
Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator

Digital High Voltage Electric Bridge Xhhg521A Cable Sheath Fault Pre Locator


FAQ:

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,
it is according to quantity.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. 



 
 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now