• China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device
  • China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device
  • China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device
  • China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device
  • China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device

China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device

After-sales Service: Warranty Certificate
Warranty: 12 Months
Usage: Transformer Degaussing
Power: Electricity
Certification: ISO
Customized: Customized
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Features
  • Product Parameters
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
XHXC105/110
Color
Black
Degaussing Current
10/5A, 1A, 200mA, 5mA Customized
Mode
Manual, Automatic
Transport Package
Exported Wooden Case
Trademark
XZH TEST
Origin
China
Production Capacity
2000PCS/Year

Product Description

 



 

China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device




English version available

Product Description


XHXC105/110  Power transformer degaussing instrument

XHXC105 : degaussing current 5A
XHXC110:  degaussing current 10A


Product description:
XHXC105 current transformer degaussing instrument is to eliminate hazards of the residual magnetism after the DC resistance test of large power transformers. It can protect power transformer from inrush current impact, as well as has an extremely important role in safety commissioning.

Due to the inherent hysteresis of the ferromagnetic materials, after the transformer voltage ratio, DC resistance measurement will be residual magnetism in the core. Due to the presence of residual magnetism the transformer put into operation the transformer core would be a half saturation, resulting in a large number of harmonics in the excitation current, which not only increases the reactive power consumption of the transformer, and may cause malfunction of the relay and economic losses. Therefore, we must do the degaussing work to ensure safe running before the transformer put into operation.

Second-generation of XHXC105 power transformer degaussing instrument added the automatic degaussing mode based on the first generation of products, the user does not have to repeat the operation. Increase from the demagnetization time from the original 30 minutes to less than four minutes.





 

Features

 

 

1. Using patented technology - DC frequency attenuation technique
2. Three phases transformer, only the B phase degaussing
3. Automatic judgment, 16AD data collected and processing function
4. Degaussing mode: Automatic and manual
5. Fast degaussing, not affected by voltage grade and capacity constraints 30 min increased to not more than 4min
6. Erasure effect: automatic over 90%/time manual over 80%/time
7. Current lines of DC resistance testing can be directly used, easily matched with DC resistance test;
8. Display the degaussing current, time and schedule.
9. Suitable for large power transformer and PT/CT to eliminate the residual magnetism of 35 kV and above before putting into operation .Especially for 330 kV and above voltage level of large capacity transformer;
10. Small volume and light weight.



 

Product Parameters

 


1.Erasing current: 10/5A, 1A, 200mA, 5mA (Can be customized)
2. Erasing time: automatic 9min/time (Do not think about voltage grade and capacitor)
3. Erasure effect: automatic over 90%/time manual over 80%/time
4. Degaussing process: 0-100% Automatic recording and erasing time
5. Working power: AC220V + 10%   50Hz + 1Hz
6. Range: 0.01-300
7. Manual: 3min / time (Do not think about voltage grade and capacitor)
8. Display: LCD 128 X 64 pixel
9. Weight: 5 kg (net weight) not including the connection wire
10. Temperature: -25 degree - 50 degree, RH90%.




 
 
 
 

 

Packaging & Shipping

 

Packaging: Wooden case filled with foam 

Shipping: by Air, Sea, Express, etc.

Shipping time: 7-15 days if it's in stock. 


 

WELCOME YOU CONTACT US FOR MORE INFORMATION

 




China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device



China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization DeviceChina Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device


China Factory High Voltage Transformer Degaussing Instrument Transformer Demagnetization Device



 

FAQ

 

 

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,
it is according to quantity.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. 


If you have other questions, pls send us an inquiry below:

XI'AN XU&HUI ELECTROMECHANICAL TECHNOLOGY CO.,LTD

Building B8-01, Phase I, Ronghao Industrial City, No. 2098, Weiyang 9th Road, Gaoling District, Xi'an
 
 

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now